tim berry
Well-Known Member
ok folks after a brutal winter the snow blower is away. its time to get back on the rear quarter extensions . after long and deliberate thought I think i've solved a very large problem with molding these parts, the internal support structure is going to have to be cut out and discarded because there is no way to get them off the extension without destroying the whole part . the new game plan is to cut the structure out leaving the bolts attached and filling the void inside with foam so that I can control the volume of casting resin used to make the parts ( the stuff is expensive plus i've got 2 gallons about $500 , to get the whole back done). It just needs to be warmer more photos to folow